Operating Bitcoin Mining Power Infrastructure Capacity (MW)
TeraWulf Operating Bitcoin Mining Power Infrastructure Capacity: 145.00 mw in Q3 2026, down 40.8% from a year earlier.
Where the Q3 2026 figure comes from
Source: TeraWulf Form 10-Q (filed 2026-11-06) ↗
Energized wholly owned power infrastructure allocated to Bitcoin mining at Lake Mariner, declining from 245 MW in FY2025 to 145 MW in Q1–Q3 2026 as power capacity is reallocated to AI/HPC data center buildings.
quarterly history
Hover a value to see the sentence it was read from; calculated values show their formula
| Period | Ended | Operating Bitcoin Mining Power Infrastructure Capacity (MW) | Year on year | Source |
|---|---|---|---|---|
| Q3 2026 | Sep 30, 2026 | 145.00 | -40.8% | TeraWulf Form 10-Q (filed 2026-11-06) ↗ |
| Q2 2026 | Jun 30, 2026 | 145.00 | -40.8% | TeraWulf Form 10-Q (filed 2026-08-05) ↗ |
| Q1 2026 | Mar 31, 2026 | 145.00 | -40.8% | TeraWulf Form 10-Q (filed 2026-05-08) ↗ |
| Q4 2025 | Dec 31, 2025 | 245.00 | +25.6% | TeraWulf Form 10-K (filed 2026-02-27) ↗ |
| Q3 2025 | Sep 30, 2025 | 245.00 | +25.6% | TeraWulf Form 10-Q (filed 2025-11-10) ↗ |
| Q2 2025 | Jun 30, 2025 | 245.00 | +25.6% | TeraWulf Form 10-Q (filed 2025-08-08) ↗ |
| Q1 2025 | Mar 31, 2025 | 245.00 | +53.1% | TeraWulf Form 10-Q (filed 2025-05-09) ↗ |
| Q4 2024 | Dec 31, 2024 | 195.00 | +69.6% | TeraWulf Form 10-K (filed 2025-03-03) ↗ |
| Q3 2024 | Sep 30, 2024 | 195.00 | +77.3% | TeraWulf Form 10-Q (filed 2024-11-12) ↗ |
| Q2 2024 | Jun 30, 2024 | 195.00 | – | TeraWulf Form 10-Q (filed 2024-08-13) ↗ |
| Q1 2024 | Mar 31, 2024 | 160.00 | – | TeraWulf Form 10-Q (filed 2024-05-13) ↗ |
| Q4 2023 | Dec 31, 2023 | 115.00 | – | TeraWulf Form 10-K (filed 2024-03-20) ↗ |
| Q3 2023 | Sep 30, 2023 | 110.00 | – | TeraWulf Form 10-Q/A (filed 2023-11-22) ↗ |
Breakdown
What makes up operating Bitcoin Mining Power Infrastructure Capacity
Cite this data
StockData. (2026). TeraWulf Operating Bitcoin Mining Power Infrastructure Capacity, quarterly Q3 2023–Q3 2026 [Data set]. Compiled from TeraWulf SEC filings and investor materials. https://stockdatahq.com/stocks/wulf/kpis/btc-mining-operating-capacity-mw
See every metric in the TeraWulf KPI table. Data updated Nov 16, 2026.
See a number that looks wrong?