Iamgold Essakane by Quarter
Essakane — Open-Pit Mining, Waste Stripping & Grade Mined (100% Basis) ($M)
quarterly history
Hover a value to see the sentence it was read from; calculated values show their formula
| Period | Ended | Essakane — Open-Pit Mining, Waste Stripping & Grade Mined (100% Basis) ($M) | Year on year | Source |
|---|
Breakdown
What makes up essakane
- Essakane — Ore Mined (kt)2,971.00 · Q3 2026
- Essakane — Operating Waste Mined (kt)2,739.00 · Q3 2026
- Essakane — Capitalized Waste Stripped (kt)5,277.00 · Q3 2026
- Essakane — Combined Waste Mined (kt, Legacy Pre-2024 Presentation)9,693.00 · Q4 2023
- Essakane — Operating Material Mined (Ore + Operating Waste, kt)5,710.00 · Q3 2026
- Essakane — Total Material Mined (kt)10,987.00 · Q3 2026
- Essakane — Strip Ratio (waste : ore)2.70 · Q3 2026
- Essakane — Average Grade Mined (g/t Au)1.17 · Q3 2026
Cite this data
StockData. (2026). Iamgold Essakane ($M), quarterly [Data set]. Compiled from Iamgold SEC filings and investor materials. https://stockdatahq.com/stocks/iag/kpis/essakane-mining-hdr
See every metric in the Iamgold KPI table. Data updated Nov 14, 2026.