Suncor Energy Inc
Close on Nov 2, 2026Market cap $90.02BP/E 21.7Yield –
Suncor Energy Gross Oil Sands Bitumen Mined & Extracted Before by Year
Gross Oil Sands Bitumen Mined & Extracted Before Upgrading (mbbls/d)
Suncor Energy Gross Oil Sands Bitumen Mined & Extracted Before: 938 in 2025, up 3.4% from a year earlier.
Where the 2025 figure comes from
Source: Suncor Energy Form 40-F, filed 2026-02-26 ↗
Reported in SEC Form 6-K & Form 40-F AIF.
Annual history
Hover a value to see the sentence it was read from; calculated values show their formula
| Period | Ended | Gross Oil Sands Bitumen Mined & Extracted Before Upgrading (mbbls/d) | Year on year | Source |
|---|---|---|---|---|
| 2025 | Dec 31, 2025 | 938 | +3.4% | Suncor Energy Form 40-F, filed 2026-02-26 ↗ |
| 2024 | Dec 31, 2024 | 907 | +10.6% | Suncor Energy Form 40-F, filed 2026-02-26 ↗ |
| 2023 | Dec 31, 2023 | 820 | +3.7% | Suncor Energy Form 40-F, filed 2025-02-27 ↗ |
| 2022 | Dec 31, 2022 | 791 | +2.6% | Suncor Energy Form 6-K, filed 2023-11-09 ↗ |
| 2021 | Dec 31, 2021 | 770 | – | Suncor Energy Form 6-K, filed 2022-11-03 ↗ |
Breakdown
What makes up gross Oil Sands Bitumen Mined & Extracted Before
- Base Plant Mine — Gross Bitumen Mined (mbbls/d, Form 40-F AIF)263 · 2025
- Firebag SAGD — Gross In Situ Bitumen (mbbls/d, Form 40-F AIF)245 · 2025
- Syncrude Mine — Gross Bitumen Mined (58.74% WI, mbbls/d, Form 40-F AIF)222 · 2025
- Fort Hills Mine — Gross Bitumen Mined (100% WI, mbbls/d, Form 40-F AIF)175 · 2025
- MacKay River SAGD — Gross In Situ Bitumen (mbbls/d, Form 40-F AIF)33 · 2025
- Base Mine — Net SCO Output (mbbls/d, NI 51-101 Field History)196 · 2025
- Syncrude — Net SCO Output (mbbls/d, NI 51-101 Field History)191 · 2025
- Firebag — Upgraded Net SCO Portion (mbbls/d, NI 51-101 Field History)94 · 2025
- Firebag — Non-Upgraded Bitumen Portion (mbbls/d, NI 51-101 Field History)118 · 2025
- Fort Hills — Internally Upgraded SCO Portion (mbbls/d, NI 51-101 Field History)37 · 2025
- Fort Hills — Non-Upgraded Bitumen Portion (mbbls/d, NI 51-101 Field History)129 · 2025
- MacKay River — Non-Upgraded Bitumen Output (mbbls/d, NI 51-101 Field History)33 · 2025
- Annual Guidance — Total Bitumen Production Low (mbbls/d)915 · 2026
- Annual Guidance — Total Bitumen Production High (mbbls/d)955 · 2026
Cite this data
StockData. (2026). Suncor Energy Gross Oil Sands Bitumen Mined & Extracted Before, annual 2021–2025 [Data set]. Compiled from Suncor Energy SEC filings and investor materials. https://stockdatahq.com/stocks/su/kpis/os-total-bitumen-prod
See every metric in the Suncor Energy KPI table. Data updated Nov 1, 2026.