Suncor Energy Inc
Close on Nov 2, 2026Market cap $90.02BP/E 21.8Yield –
Suncor Energy Gross Oil Sands Bitumen Mined & Extracted Before by Quarter
Gross Oil Sands Bitumen Mined & Extracted Before Upgrading (mbbls/d)
Suncor Energy Gross Oil Sands Bitumen Mined & Extracted Before: 815 in Q2 2026, down 5.3% from a year earlier.
Where the Q2 2026 figure comes from
Source: Suncor Energy Form 6-K, filed 2026-08-05 ↗
Reported in SEC Form 6-K & Form 40-F AIF.
Quarterly history
Hover a value to see the sentence it was read from; calculated values show their formula
Breakdown
What makes up gross Oil Sands Bitumen Mined & Extracted Before
- Base Plant Mine — Gross Bitumen Mined (mbbls/d, Form 40-F AIF)–
- Firebag SAGD — Gross In Situ Bitumen (mbbls/d, Form 40-F AIF)–
- Syncrude Mine — Gross Bitumen Mined (58.74% WI, mbbls/d, Form 40-F AIF)–
- Fort Hills Mine — Gross Bitumen Mined (100% WI, mbbls/d, Form 40-F AIF)–
- MacKay River SAGD — Gross In Situ Bitumen (mbbls/d, Form 40-F AIF)–
- Base Mine — Net SCO Output (mbbls/d, NI 51-101 Field History)–
- Syncrude — Net SCO Output (mbbls/d, NI 51-101 Field History)–
- Firebag — Upgraded Net SCO Portion (mbbls/d, NI 51-101 Field History)–
- Firebag — Non-Upgraded Bitumen Portion (mbbls/d, NI 51-101 Field History)–
- Fort Hills — Internally Upgraded SCO Portion (mbbls/d, NI 51-101 Field History)–
- Fort Hills — Non-Upgraded Bitumen Portion (mbbls/d, NI 51-101 Field History)–
- MacKay River — Non-Upgraded Bitumen Output (mbbls/d, NI 51-101 Field History)–
- Annual Guidance — Total Bitumen Production Low (mbbls/d)–
- Annual Guidance — Total Bitumen Production High (mbbls/d)–
Cite this data
StockData. (2026). Suncor Energy Gross Oil Sands Bitumen Mined & Extracted Before, quarterly Q1 2021–Q2 2026 [Data set]. Compiled from Suncor Energy SEC filings and investor materials. https://stockdatahq.com/stocks/su/kpis/os-total-bitumen-prod
See every metric in the Suncor Energy KPI table. Data updated Nov 1, 2026.