Imperial Oil Ltd
Close on Nov 25, 2026Market cap $56.46BP/E 13.3Yield 1.72%
Imperial Oil Syncrude Aurora North Mine by Month
Syncrude Aurora North Mine (AER ST39 ABOS0080249) — Crude Bitumen Production (m³)
Imperial Oil Syncrude Aurora North Mine: 1,201,338.00 m3 in Jul 2026, up 7.7% from a year earlier.
Where the Jul 2026 figure comes from
“AER ST39 ABOS0080249 (2026-07) | Crude Bitumen (m³) | Production: 1201338.0”
100% joint venture facility monthly crude bitumen production at Syncrude Aurora North Mine transferred to Mildred Lake for upgrading.
monthly history
Hover a value to see the sentence it was read from; calculated values show their formula
Breakdown
What makes up syncrude Aurora North Mine
- Syncrude Aurora North — Crude Bitumen Deliveries to Mildred Lake (m³)1,200,292.00 · Jul 2026
- Syncrude Aurora North — Oil Sands Ore Mined (tonnes)11,750,548.00 · Jul 2026
- Syncrude Aurora North — Mined Oil Sands Ore Grade (wt% bitumen)11.6% · Jul 2026
- Syncrude Aurora North — Oil Sands Ore Processed (tonnes)11,148,133.00 · Jul 2026
- Syncrude Aurora North — Processed Oil Sands Ore Grade (wt% bitumen)11.5% · Jul 2026
- Syncrude Aurora North — Purchased Natural Gas Receipts (10³m³)52,489.00 · Jul 2026
- Syncrude Aurora North — Electricity Generated On-Site (MWh)118,731.00 · Jul 2026
- Syncrude Aurora North — Electricity Plant Use (MWh)55,852.00 · Jul 2026
Cite this data
StockData. (2026). Imperial Oil Syncrude Aurora North Mine, monthly Jan 2020–Jul 2026 [Data set]. Compiled from Imperial Oil SEC filings and investor materials. https://stockdatahq.com/stocks/imo/kpis/aer-syncrude-au-bitumen-prod-m3
See every metric in the Imperial Oil KPI table. Data updated Nov 3, 2026.
See a number that looks wrong?