Equinox Gold Corp.
Close on Nov 25, 2026Market cap $7.13BP/E 25.9Yield –
Equinox Gold Open-Pit Strip Ratio (Waste : Ore, x) by Quarter
Open-Pit Strip Ratio (Waste : Ore, x) (×)
Equinox Gold Open-Pit Strip Ratio (Waste : Ore, x): 2.97× in Q4 2024, up 52.3% from a year earlier. No newer figure appears in the documents we track.
Where the Q4 2024 figure comes from
“SantaLuz | Open pit strip ratio | FY2024Q4: 2.97”
Source: Equinox Gold Corp. SEC Filing (0001628280-25-013606 / eqx-20241231mda.htm) ↗
quarterly history
Hover a value to see the sentence it was read from; calculated values show their formula
Cite this data
StockData. (2026). Equinox Gold Open-Pit Strip Ratio (Waste : Ore, x) (×), quarterly Q2 2022–Q4 2024 [Data set]. Compiled from Equinox Gold SEC filings and investor materials. https://stockdatahq.com/stocks/eqx/kpis/slz-strip-ratio-wo
See every metric in the Equinox Gold KPI table. Data updated Nov 15, 2026.
See a number that looks wrong?