Equinox Gold Corp.
Close on Nov 25, 2026Market cap $7.13BP/E 25.9Yield –
Equinox Gold Discontinued Brazil Operations by Quarter
Discontinued Brazil Operations — Combined Segment Total (Gold Produced, oz)
Equinox Gold Discontinued Brazil Operations: 73,745.00 oz in Q4 2025, down 6.5% from a year earlier.
Where the Q4 2025 figure comes from
“Brazil | Gold produced | FY2025Q4: 73,745”
Source: Equinox Gold Corp. SEC Filing (0001628280-26-022120 / eqx-20251231mda.htm) ↗
Equinox Gold completed the sale of 100% of its Brazil Operations (Aurizona, Bahia Complex, and RDM) on January 23, 2026 for $891.1M cash at closing plus up to $115M in contingent consideration, applying proceeds to retire over $800M of debt.
quarterly history
Hover a value to see the sentence it was read from; calculated values show their formula
| Period | Ended | Discontinued Brazil Operations — Combined Segment Total (Gold Produced, oz) | Year on year | Source |
|---|---|---|---|---|
| Q4 2025 | Dec 31, 2025 | 73,745.00 | -6.5% | Equinox Gold Corp. SEC Filing (0001628280-26-022120 / eqx-20251231mda.htm) ↗ |
| Q3 2025 | Sep 30, 2025 | 67,629.00 | +8.1% | Equinox Gold Corp. SEC Filing (0001628280-26-022120 / eqx-20251231mda.htm) ↗ |
| Q2 2025 | Jun 30, 2025 | 63,701.00 | – | Equinox Gold Corp. SEC Filing (0001628280-25-049729 / eqx-20250930mda.htm) ↗ |
| Q4 2024 | Dec 31, 2024 | 78,912.00 | – | Equinox Gold Corp. SEC Filing (0001628280-26-022120 / eqx-20251231mda.htm) ↗ |
| Q3 2024 | Sep 30, 2024 | 62,582.00 | – | Equinox Gold Corp. SEC Filing (0001628280-25-049729 / eqx-20250930mda.htm) ↗ |
Breakdown
What makes up discontinued Brazil Operations
- Gold Sold (oz)73,834.00 · Q4 2025
- Aurizona Mine — Maranhao, Brazil (Gold Produced, oz)18,936.00 · Q3 2025
- Bahia Complex — Combined Fazenda & Santa Luz, Brazil (Gold Produced, oz)31,503.00 · Q3 2025
- Fazenda Mine — Bahia, Brazil (Standalone Gold Produced, oz)18,522.00 · Q4 2024
- Santa Luz Resin-in-Leach Mine — Bahia, Brazil (Standalone Gold Produced, oz)14,793.00 · Q4 2024
- RDM (Riacho dos Machados) Mine — Minas Gerais, Brazil (Gold Produced, oz)17,190.00 · Q3 2025
- Unit Costs, Revenue, Sustaining & Growth Capital–
Cite this data
StockData. (2026). Equinox Gold Discontinued Brazil Operations, quarterly Q3 2024–Q4 2025 [Data set]. Compiled from Equinox Gold SEC filings and investor materials. https://stockdatahq.com/stocks/eqx/kpis/brz-gold-produced-oz
See every metric in the Equinox Gold KPI table. Data updated Nov 15, 2026.
See a number that looks wrong?