| Jun 2026 | Jun 30, 2026 | 70.16 | +38.6% | Canada Energy Regulator (CER) — Trans Mountain Pipeline Monthly Throughput & Capacity ↗ |
|---|
| May 2026 | May 31, 2026 | 57.01 | -13.3% | Canada Energy Regulator (CER) — Trans Mountain Pipeline Monthly Throughput & Capacity ↗ |
|---|
| Apr 2026 | Apr 30, 2026 | 71.70 | +3.6% | Canada Energy Regulator (CER) — Trans Mountain Pipeline Monthly Throughput & Capacity ↗ |
|---|
| Mar 2026 | Mar 31, 2026 | 68.69 | +2.2% | Canada Energy Regulator (CER) — Trans Mountain Pipeline Monthly Throughput & Capacity ↗ |
|---|
| Feb 2026 | Feb 28, 2026 | 48.44 | -5.7% | Canada Energy Regulator (CER) — Trans Mountain Pipeline Monthly Throughput & Capacity ↗ |
|---|
| Jan 2026 | Jan 31, 2026 | 59.89 | +6.1% | Canada Energy Regulator (CER) — Trans Mountain Pipeline Monthly Throughput & Capacity ↗ |
|---|
| Dec 2025 | Dec 31, 2025 | 55.97 | +22.4% | Canada Energy Regulator (CER) — Trans Mountain Pipeline Monthly Throughput & Capacity ↗ |
|---|
| Nov 2025 | Nov 30, 2025 | 80.34 | +48.4% | Canada Energy Regulator (CER) — Trans Mountain Pipeline Monthly Throughput & Capacity ↗ |
|---|
| Oct 2025 | Oct 31, 2025 | 75.60 | +40.7% | Canada Energy Regulator (CER) — Trans Mountain Pipeline Monthly Throughput & Capacity ↗ |
|---|
| Sep 2025 | Sep 30, 2025 | 61.56 | +81.5% | Canada Energy Regulator (CER) — Trans Mountain Pipeline Monthly Throughput & Capacity ↗ |
|---|
| Aug 2025 | Aug 31, 2025 | 54.10 | +25.6% | Canada Energy Regulator (CER) — Trans Mountain Pipeline Monthly Throughput & Capacity ↗ |
|---|
| Jul 2025 | Jul 31, 2025 | 54.28 | +29.4% | Canada Energy Regulator (CER) — Trans Mountain Pipeline Monthly Throughput & Capacity ↗ |
|---|
| Jun 2025 | Jun 30, 2025 | 50.63 | -4.3% | Canada Energy Regulator (CER) — Trans Mountain Pipeline Monthly Throughput & Capacity ↗ |
|---|
| May 2025 | May 31, 2025 | 65.78 | +981.9% | Canada Energy Regulator (CER) — Trans Mountain Pipeline Monthly Throughput & Capacity ↗ |
|---|
| Apr 2025 | Apr 30, 2025 | 69.23 | +16,000.0% | Canada Energy Regulator (CER) — Trans Mountain Pipeline Monthly Throughput & Capacity ↗ |
|---|
| Mar 2025 | Mar 31, 2025 | 67.22 | +2,155.7% | Canada Energy Regulator (CER) — Trans Mountain Pipeline Monthly Throughput & Capacity ↗ |
|---|
| Feb 2025 | Feb 28, 2025 | 51.38 | +6,090.4% | Canada Energy Regulator (CER) — Trans Mountain Pipeline Monthly Throughput & Capacity ↗ |
|---|
| Jan 2025 | Jan 31, 2025 | 56.46 | +852.1% | Canada Energy Regulator (CER) — Trans Mountain Pipeline Monthly Throughput & Capacity ↗ |
|---|
| Dec 2024 | Dec 31, 2024 | 45.72 | +630.4% | Canada Energy Regulator (CER) — Trans Mountain Pipeline Monthly Throughput & Capacity ↗ |
|---|
| Nov 2024 | Nov 30, 2024 | 54.15 | +1,502.1% | Canada Energy Regulator (CER) — Trans Mountain Pipeline Monthly Throughput & Capacity ↗ |
|---|
| Oct 2024 | Oct 31, 2024 | 53.74 | +1,065.7% | Canada Energy Regulator (CER) — Trans Mountain Pipeline Monthly Throughput & Capacity ↗ |
|---|
| Sep 2024 | Sep 30, 2024 | 33.91 | +1,019.1% | Canada Energy Regulator (CER) — Trans Mountain Pipeline Monthly Throughput & Capacity ↗ |
|---|
| Aug 2024 | Aug 31, 2024 | 43.08 | – | Canada Energy Regulator (CER) — Trans Mountain Pipeline Monthly Throughput & Capacity ↗ |
|---|
| Jul 2024 | Jul 31, 2024 | 41.96 | +1,393.2% | Canada Energy Regulator (CER) — Trans Mountain Pipeline Monthly Throughput & Capacity ↗ |
|---|
| Jun 2024 | Jun 30, 2024 | 52.89 | +811.9% | Canada Energy Regulator (CER) — Trans Mountain Pipeline Monthly Throughput & Capacity ↗ |
|---|
| May 2024 | May 31, 2024 | 6.08 | – | Canada Energy Regulator (CER) — Trans Mountain Pipeline Monthly Throughput & Capacity ↗ |
|---|
| Apr 2024 | Apr 30, 2024 | 0.43 | -96.2% | Canada Energy Regulator (CER) — Trans Mountain Pipeline Monthly Throughput & Capacity ↗ |
|---|
| Mar 2024 | Mar 31, 2024 | 2.98 | -70.0% | Canada Energy Regulator (CER) — Trans Mountain Pipeline Monthly Throughput & Capacity ↗ |
|---|
| Feb 2024 | Feb 29, 2024 | 0.83 | -88.3% | Canada Energy Regulator (CER) — Trans Mountain Pipeline Monthly Throughput & Capacity ↗ |
|---|
| Jan 2024 | Jan 31, 2024 | 5.93 | +17.2% | Canada Energy Regulator (CER) — Trans Mountain Pipeline Monthly Throughput & Capacity ↗ |
|---|
| Dec 2023 | Dec 31, 2023 | 6.26 | +98.1% | Canada Energy Regulator (CER) — Trans Mountain Pipeline Monthly Throughput & Capacity ↗ |
|---|
| Nov 2023 | Nov 30, 2023 | 3.38 | +651.1% | Canada Energy Regulator (CER) — Trans Mountain Pipeline Monthly Throughput & Capacity ↗ |
|---|
| Oct 2023 | Oct 31, 2023 | 4.61 | -44.6% | Canada Energy Regulator (CER) — Trans Mountain Pipeline Monthly Throughput & Capacity ↗ |
|---|
| Sep 2023 | Sep 30, 2023 | 3.03 | -49.9% | Canada Energy Regulator (CER) — Trans Mountain Pipeline Monthly Throughput & Capacity ↗ |
|---|
| Aug 2023 | Aug 31, 2023 | 0.00 | – | Canada Energy Regulator (CER) — Trans Mountain Pipeline Monthly Throughput & Capacity ↗ |
|---|
| Jul 2023 | Jul 31, 2023 | 2.81 | +223.0% | Canada Energy Regulator (CER) — Trans Mountain Pipeline Monthly Throughput & Capacity ↗ |
|---|
| Jun 2023 | Jun 30, 2023 | 5.80 | +8.0% | Canada Energy Regulator (CER) — Trans Mountain Pipeline Monthly Throughput & Capacity ↗ |
|---|
| May 2023 | May 31, 2023 | 0.00 | -100.0% | Canada Energy Regulator (CER) — Trans Mountain Pipeline Monthly Throughput & Capacity ↗ |
|---|
| Apr 2023 | Apr 30, 2023 | 11.39 | +122.9% | Canada Energy Regulator (CER) — Trans Mountain Pipeline Monthly Throughput & Capacity ↗ |
|---|
| Mar 2023 | Mar 31, 2023 | 9.94 | +0.3% | Canada Energy Regulator (CER) — Trans Mountain Pipeline Monthly Throughput & Capacity ↗ |
|---|
| Feb 2023 | Feb 28, 2023 | 7.12 | +107.6% | Canada Energy Regulator (CER) — Trans Mountain Pipeline Monthly Throughput & Capacity ↗ |
|---|
| Jan 2023 | Jan 31, 2023 | 5.06 | +68.1% | Canada Energy Regulator (CER) — Trans Mountain Pipeline Monthly Throughput & Capacity ↗ |
|---|
| Dec 2022 | Dec 31, 2022 | 3.16 | +6.4% | Canada Energy Regulator (CER) — Trans Mountain Pipeline Monthly Throughput & Capacity ↗ |
|---|
| Nov 2022 | Nov 30, 2022 | 0.45 | -91.6% | Canada Energy Regulator (CER) — Trans Mountain Pipeline Monthly Throughput & Capacity ↗ |
|---|
| Oct 2022 | Oct 31, 2022 | 8.32 | +8.2% | Canada Energy Regulator (CER) — Trans Mountain Pipeline Monthly Throughput & Capacity ↗ |
|---|
| Sep 2022 | Sep 30, 2022 | 6.05 | -18.2% | Canada Energy Regulator (CER) — Trans Mountain Pipeline Monthly Throughput & Capacity ↗ |
|---|
| Aug 2022 | Aug 31, 2022 | 0.00 | -100.0% | Canada Energy Regulator (CER) — Trans Mountain Pipeline Monthly Throughput & Capacity ↗ |
|---|
| Jul 2022 | Jul 31, 2022 | 0.87 | -91.3% | Canada Energy Regulator (CER) — Trans Mountain Pipeline Monthly Throughput & Capacity ↗ |
|---|
| Jun 2022 | Jun 30, 2022 | 5.37 | +195.1% | Canada Energy Regulator (CER) — Trans Mountain Pipeline Monthly Throughput & Capacity ↗ |
|---|
| May 2022 | May 31, 2022 | 2.74 | -62.9% | Canada Energy Regulator (CER) — Trans Mountain Pipeline Monthly Throughput & Capacity ↗ |
|---|
| Apr 2022 | Apr 30, 2022 | 5.11 | -34.7% | Canada Energy Regulator (CER) — Trans Mountain Pipeline Monthly Throughput & Capacity ↗ |
|---|
| Mar 2022 | Mar 31, 2022 | 9.91 | +231.4% | Canada Energy Regulator (CER) — Trans Mountain Pipeline Monthly Throughput & Capacity ↗ |
|---|
| Feb 2022 | Feb 28, 2022 | 3.43 | -46.2% | Canada Energy Regulator (CER) — Trans Mountain Pipeline Monthly Throughput & Capacity ↗ |
|---|
| Jan 2022 | Jan 31, 2022 | 3.01 | +2.0% | Canada Energy Regulator (CER) — Trans Mountain Pipeline Monthly Throughput & Capacity ↗ |
|---|
| Dec 2021 | Dec 31, 2021 | 2.97 | -41.5% | Canada Energy Regulator (CER) — Trans Mountain Pipeline Monthly Throughput & Capacity ↗ |
|---|
| Nov 2021 | Nov 30, 2021 | 5.37 | +85.2% | Canada Energy Regulator (CER) — Trans Mountain Pipeline Monthly Throughput & Capacity ↗ |
|---|
| Oct 2021 | Oct 31, 2021 | 7.69 | +34.0% | Canada Energy Regulator (CER) — Trans Mountain Pipeline Monthly Throughput & Capacity ↗ |
|---|
| Sep 2021 | Sep 30, 2021 | 7.40 | +1,750.0% | Canada Energy Regulator (CER) — Trans Mountain Pipeline Monthly Throughput & Capacity ↗ |
|---|
| Aug 2021 | Aug 31, 2021 | 2.85 | +235.3% | Canada Energy Regulator (CER) — Trans Mountain Pipeline Monthly Throughput & Capacity ↗ |
|---|
| Jul 2021 | Jul 31, 2021 | 9.97 | +2,523.7% | Canada Energy Regulator (CER) — Trans Mountain Pipeline Monthly Throughput & Capacity ↗ |
|---|
| Jun 2021 | Jun 30, 2021 | 1.82 | -77.8% | Canada Energy Regulator (CER) — Trans Mountain Pipeline Monthly Throughput & Capacity ↗ |
|---|
| May 2021 | May 31, 2021 | 7.38 | -51.0% | Canada Energy Regulator (CER) — Trans Mountain Pipeline Monthly Throughput & Capacity ↗ |
|---|
| Apr 2021 | Apr 30, 2021 | 7.82 | +100.0% | Canada Energy Regulator (CER) — Trans Mountain Pipeline Monthly Throughput & Capacity ↗ |
|---|
| Mar 2021 | Mar 31, 2021 | 2.99 | -52.7% | Canada Energy Regulator (CER) — Trans Mountain Pipeline Monthly Throughput & Capacity ↗ |
|---|
| Feb 2021 | Feb 28, 2021 | 6.37 | -25.6% | Canada Energy Regulator (CER) — Trans Mountain Pipeline Monthly Throughput & Capacity ↗ |
|---|
| Jan 2021 | Jan 31, 2021 | 2.95 | +143.8% | Canada Energy Regulator (CER) — Trans Mountain Pipeline Monthly Throughput & Capacity ↗ |
|---|
| Dec 2020 | Dec 31, 2020 | 5.08 | -9.8% | Canada Energy Regulator (CER) — Trans Mountain Pipeline Monthly Throughput & Capacity ↗ |
|---|
| Nov 2020 | Nov 30, 2020 | 2.90 | +25.5% | Canada Energy Regulator (CER) — Trans Mountain Pipeline Monthly Throughput & Capacity ↗ |
|---|
| Oct 2020 | Oct 31, 2020 | 5.74 | – | Canada Energy Regulator (CER) — Trans Mountain Pipeline Monthly Throughput & Capacity ↗ |
|---|
| Sep 2020 | Sep 30, 2020 | 0.40 | -89.4% | Canada Energy Regulator (CER) — Trans Mountain Pipeline Monthly Throughput & Capacity ↗ |
|---|
| Aug 2020 | Aug 31, 2020 | 0.85 | -70.2% | Canada Energy Regulator (CER) — Trans Mountain Pipeline Monthly Throughput & Capacity ↗ |
|---|
| Jul 2020 | Jul 31, 2020 | 0.38 | -53.7% | Canada Energy Regulator (CER) — Trans Mountain Pipeline Monthly Throughput & Capacity ↗ |
|---|
| Jun 2020 | Jun 30, 2020 | 8.18 | +98.5% | Canada Energy Regulator (CER) — Trans Mountain Pipeline Monthly Throughput & Capacity ↗ |
|---|
| May 2020 | May 31, 2020 | 15.07 | +378.4% | Canada Energy Regulator (CER) — Trans Mountain Pipeline Monthly Throughput & Capacity ↗ |
|---|
| Apr 2020 | Apr 30, 2020 | 3.91 | -27.3% | Canada Energy Regulator (CER) — Trans Mountain Pipeline Monthly Throughput & Capacity ↗ |
|---|
| Mar 2020 | Mar 31, 2020 | 6.32 | – | Canada Energy Regulator (CER) — Trans Mountain Pipeline Monthly Throughput & Capacity ↗ |
|---|
| Feb 2020 | Feb 29, 2020 | 8.56 | +590.3% | Canada Energy Regulator (CER) — Trans Mountain Pipeline Monthly Throughput & Capacity ↗ |
|---|
| Jan 2020 | Jan 31, 2020 | 1.21 | -14.2% | Canada Energy Regulator (CER) — Trans Mountain Pipeline Monthly Throughput & Capacity ↗ |
|---|
| Dec 2019 | Dec 31, 2019 | 5.63 | -25.0% | Canada Energy Regulator (CER) — Trans Mountain Pipeline Monthly Throughput & Capacity ↗ |
|---|
| Nov 2019 | Nov 30, 2019 | 2.31 | -80.6% | Canada Energy Regulator (CER) — Trans Mountain Pipeline Monthly Throughput & Capacity ↗ |
|---|
| Oct 2019 | Oct 31, 2019 | 0.00 | -100.0% | Canada Energy Regulator (CER) — Trans Mountain Pipeline Monthly Throughput & Capacity ↗ |
|---|
| Sep 2019 | Sep 30, 2019 | 3.79 | -60.4% | Canada Energy Regulator (CER) — Trans Mountain Pipeline Monthly Throughput & Capacity ↗ |
|---|
| Aug 2019 | Aug 31, 2019 | 2.85 | -57.4% | Canada Energy Regulator (CER) — Trans Mountain Pipeline Monthly Throughput & Capacity ↗ |
|---|
| Jul 2019 | Jul 31, 2019 | 0.82 | -91.7% | Canada Energy Regulator (CER) — Trans Mountain Pipeline Monthly Throughput & Capacity ↗ |
|---|
| Jun 2019 | Jun 30, 2019 | 4.12 | +132.8% | Canada Energy Regulator (CER) — Trans Mountain Pipeline Monthly Throughput & Capacity ↗ |
|---|
| May 2019 | May 31, 2019 | 3.15 | -74.5% | Canada Energy Regulator (CER) — Trans Mountain Pipeline Monthly Throughput & Capacity ↗ |
|---|
| Apr 2019 | Apr 30, 2019 | 5.38 | -60.1% | Canada Energy Regulator (CER) — Trans Mountain Pipeline Monthly Throughput & Capacity ↗ |
|---|
| Mar 2019 | Mar 31, 2019 | 0.00 | -100.0% | Canada Energy Regulator (CER) — Trans Mountain Pipeline Monthly Throughput & Capacity ↗ |
|---|
| Feb 2019 | Feb 28, 2019 | 1.24 | -89.4% | Canada Energy Regulator (CER) — Trans Mountain Pipeline Monthly Throughput & Capacity ↗ |
|---|
| Jan 2019 | Jan 31, 2019 | 1.41 | -79.2% | Canada Energy Regulator (CER) — Trans Mountain Pipeline Monthly Throughput & Capacity ↗ |
|---|
| Dec 2018 | Dec 31, 2018 | 7.51 | – | Canada Energy Regulator (CER) — Trans Mountain Pipeline Monthly Throughput & Capacity ↗ |
|---|
| Nov 2018 | Nov 30, 2018 | 11.89 | – | Canada Energy Regulator (CER) — Trans Mountain Pipeline Monthly Throughput & Capacity ↗ |
|---|
| Oct 2018 | Oct 31, 2018 | 8.32 | – | Canada Energy Regulator (CER) — Trans Mountain Pipeline Monthly Throughput & Capacity ↗ |
|---|
| Sep 2018 | Sep 30, 2018 | 9.58 | – | Canada Energy Regulator (CER) — Trans Mountain Pipeline Monthly Throughput & Capacity ↗ |
|---|
| Aug 2018 | Aug 31, 2018 | 6.69 | – | Canada Energy Regulator (CER) — Trans Mountain Pipeline Monthly Throughput & Capacity ↗ |
|---|
| Jul 2018 | Jul 31, 2018 | 9.92 | – | Canada Energy Regulator (CER) — Trans Mountain Pipeline Monthly Throughput & Capacity ↗ |
|---|
| Jun 2018 | Jun 30, 2018 | 1.77 | – | Canada Energy Regulator (CER) — Trans Mountain Pipeline Monthly Throughput & Capacity ↗ |
|---|
| May 2018 | May 31, 2018 | 12.37 | – | Canada Energy Regulator (CER) — Trans Mountain Pipeline Monthly Throughput & Capacity ↗ |
|---|
| Apr 2018 | Apr 30, 2018 | 13.48 | – | Canada Energy Regulator (CER) — Trans Mountain Pipeline Monthly Throughput & Capacity ↗ |
|---|
| Mar 2018 | Mar 31, 2018 | 9.69 | – | Canada Energy Regulator (CER) — Trans Mountain Pipeline Monthly Throughput & Capacity ↗ |
|---|
| Feb 2018 | Feb 28, 2018 | 11.71 | – | Canada Energy Regulator (CER) — Trans Mountain Pipeline Monthly Throughput & Capacity ↗ |
|---|
| Jan 2018 | Jan 31, 2018 | 6.79 | – | Canada Energy Regulator (CER) — Trans Mountain Pipeline Monthly Throughput & Capacity ↗ |
|---|