| Jun 2026 | Jun 30, 2026 | 34.32 | -0.7% | Canada Energy Regulator (CER) — Trans Mountain Pipeline Monthly Throughput & Capacity ↗ |
|---|
| May 2026 | May 31, 2026 | 32.87 | +26.4% | Canada Energy Regulator (CER) — Trans Mountain Pipeline Monthly Throughput & Capacity ↗ |
|---|
| Apr 2026 | Apr 30, 2026 | 35.96 | +75.2% | Canada Energy Regulator (CER) — Trans Mountain Pipeline Monthly Throughput & Capacity ↗ |
|---|
| Mar 2026 | Mar 31, 2026 | 37.55 | +22.4% | Canada Energy Regulator (CER) — Trans Mountain Pipeline Monthly Throughput & Capacity ↗ |
|---|
| Feb 2026 | Feb 28, 2026 | 37.03 | +2.7% | Canada Energy Regulator (CER) — Trans Mountain Pipeline Monthly Throughput & Capacity ↗ |
|---|
| Jan 2026 | Jan 31, 2026 | 35.52 | +0.3% | Canada Energy Regulator (CER) — Trans Mountain Pipeline Monthly Throughput & Capacity ↗ |
|---|
| Dec 2025 | Dec 31, 2025 | 30.86 | -18.9% | Canada Energy Regulator (CER) — Trans Mountain Pipeline Monthly Throughput & Capacity ↗ |
|---|
| Nov 2025 | Nov 30, 2025 | 30.47 | -12.0% | Canada Energy Regulator (CER) — Trans Mountain Pipeline Monthly Throughput & Capacity ↗ |
|---|
| Oct 2025 | Oct 31, 2025 | 28.73 | -17.6% | Canada Energy Regulator (CER) — Trans Mountain Pipeline Monthly Throughput & Capacity ↗ |
|---|
| Sep 2025 | Sep 30, 2025 | 33.74 | -4.6% | Canada Energy Regulator (CER) — Trans Mountain Pipeline Monthly Throughput & Capacity ↗ |
|---|
| Aug 2025 | Aug 31, 2025 | 36.20 | +10.4% | Canada Energy Regulator (CER) — Trans Mountain Pipeline Monthly Throughput & Capacity ↗ |
|---|
| Jul 2025 | Jul 31, 2025 | 32.38 | -12.9% | Canada Energy Regulator (CER) — Trans Mountain Pipeline Monthly Throughput & Capacity ↗ |
|---|
| Jun 2025 | Jun 30, 2025 | 34.55 | -11.7% | Canada Energy Regulator (CER) — Trans Mountain Pipeline Monthly Throughput & Capacity ↗ |
|---|
| May 2025 | May 31, 2025 | 26.01 | -31.9% | Canada Energy Regulator (CER) — Trans Mountain Pipeline Monthly Throughput & Capacity ↗ |
|---|
| Apr 2025 | Apr 30, 2025 | 20.53 | -35.2% | Canada Energy Regulator (CER) — Trans Mountain Pipeline Monthly Throughput & Capacity ↗ |
|---|
| Mar 2025 | Mar 31, 2025 | 30.68 | -11.4% | Canada Energy Regulator (CER) — Trans Mountain Pipeline Monthly Throughput & Capacity ↗ |
|---|
| Feb 2025 | Feb 28, 2025 | 36.07 | -11.5% | Canada Energy Regulator (CER) — Trans Mountain Pipeline Monthly Throughput & Capacity ↗ |
|---|
| Jan 2025 | Jan 31, 2025 | 35.40 | -4.8% | Canada Energy Regulator (CER) — Trans Mountain Pipeline Monthly Throughput & Capacity ↗ |
|---|
| Dec 2024 | Dec 31, 2024 | 38.06 | +17.4% | Canada Energy Regulator (CER) — Trans Mountain Pipeline Monthly Throughput & Capacity ↗ |
|---|
| Nov 2024 | Nov 30, 2024 | 34.62 | -1.6% | Canada Energy Regulator (CER) — Trans Mountain Pipeline Monthly Throughput & Capacity ↗ |
|---|
| Oct 2024 | Oct 31, 2024 | 34.87 | -3.2% | Canada Energy Regulator (CER) — Trans Mountain Pipeline Monthly Throughput & Capacity ↗ |
|---|
| Sep 2024 | Sep 30, 2024 | 35.35 | -8.2% | Canada Energy Regulator (CER) — Trans Mountain Pipeline Monthly Throughput & Capacity ↗ |
|---|
| Aug 2024 | Aug 31, 2024 | 32.79 | -16.5% | Canada Energy Regulator (CER) — Trans Mountain Pipeline Monthly Throughput & Capacity ↗ |
|---|
| Jul 2024 | Jul 31, 2024 | 37.16 | -6.1% | Canada Energy Regulator (CER) — Trans Mountain Pipeline Monthly Throughput & Capacity ↗ |
|---|
| Jun 2024 | Jun 30, 2024 | 39.11 | +7.4% | Canada Energy Regulator (CER) — Trans Mountain Pipeline Monthly Throughput & Capacity ↗ |
|---|
| May 2024 | May 31, 2024 | 38.18 | -3.9% | Canada Energy Regulator (CER) — Trans Mountain Pipeline Monthly Throughput & Capacity ↗ |
|---|
| Apr 2024 | Apr 30, 2024 | 31.67 | -9.5% | Canada Energy Regulator (CER) — Trans Mountain Pipeline Monthly Throughput & Capacity ↗ |
|---|
| Mar 2024 | Mar 31, 2024 | 34.64 | +0.8% | Canada Energy Regulator (CER) — Trans Mountain Pipeline Monthly Throughput & Capacity ↗ |
|---|
| Feb 2024 | Feb 29, 2024 | 40.74 | +12.6% | Canada Energy Regulator (CER) — Trans Mountain Pipeline Monthly Throughput & Capacity ↗ |
|---|
| Jan 2024 | Jan 31, 2024 | 37.20 | -2.2% | Canada Energy Regulator (CER) — Trans Mountain Pipeline Monthly Throughput & Capacity ↗ |
|---|
| Dec 2023 | Dec 31, 2023 | 32.43 | -18.8% | Canada Energy Regulator (CER) — Trans Mountain Pipeline Monthly Throughput & Capacity ↗ |
|---|
| Nov 2023 | Nov 30, 2023 | 35.19 | +9.8% | Canada Energy Regulator (CER) — Trans Mountain Pipeline Monthly Throughput & Capacity ↗ |
|---|
| Oct 2023 | Oct 31, 2023 | 36.03 | +20.9% | Canada Energy Regulator (CER) — Trans Mountain Pipeline Monthly Throughput & Capacity ↗ |
|---|
| Sep 2023 | Sep 30, 2023 | 38.49 | +38.3% | Canada Energy Regulator (CER) — Trans Mountain Pipeline Monthly Throughput & Capacity ↗ |
|---|
| Aug 2023 | Aug 31, 2023 | 39.27 | +1.3% | Canada Energy Regulator (CER) — Trans Mountain Pipeline Monthly Throughput & Capacity ↗ |
|---|
| Jul 2023 | Jul 31, 2023 | 39.58 | -2.3% | Canada Energy Regulator (CER) — Trans Mountain Pipeline Monthly Throughput & Capacity ↗ |
|---|
| Jun 2023 | Jun 30, 2023 | 36.40 | -3.9% | Canada Energy Regulator (CER) — Trans Mountain Pipeline Monthly Throughput & Capacity ↗ |
|---|
| May 2023 | May 31, 2023 | 39.73 | +3.6% | Canada Energy Regulator (CER) — Trans Mountain Pipeline Monthly Throughput & Capacity ↗ |
|---|
| Apr 2023 | Apr 30, 2023 | 34.99 | +25.1% | Canada Energy Regulator (CER) — Trans Mountain Pipeline Monthly Throughput & Capacity ↗ |
|---|
| Mar 2023 | Mar 31, 2023 | 34.36 | +36.3% | Canada Energy Regulator (CER) — Trans Mountain Pipeline Monthly Throughput & Capacity ↗ |
|---|
| Feb 2023 | Feb 28, 2023 | 36.18 | +12.1% | Canada Energy Regulator (CER) — Trans Mountain Pipeline Monthly Throughput & Capacity ↗ |
|---|
| Jan 2023 | Jan 31, 2023 | 38.05 | +44.2% | Canada Energy Regulator (CER) — Trans Mountain Pipeline Monthly Throughput & Capacity ↗ |
|---|
| Dec 2022 | Dec 31, 2022 | 39.95 | +79.6% | Canada Energy Regulator (CER) — Trans Mountain Pipeline Monthly Throughput & Capacity ↗ |
|---|
| Nov 2022 | Nov 30, 2022 | 32.05 | +161.8% | Canada Energy Regulator (CER) — Trans Mountain Pipeline Monthly Throughput & Capacity ↗ |
|---|
| Oct 2022 | Oct 31, 2022 | 29.79 | -7.5% | Canada Energy Regulator (CER) — Trans Mountain Pipeline Monthly Throughput & Capacity ↗ |
|---|
| Sep 2022 | Sep 30, 2022 | 27.83 | -9.1% | Canada Energy Regulator (CER) — Trans Mountain Pipeline Monthly Throughput & Capacity ↗ |
|---|
| Aug 2022 | Aug 31, 2022 | 38.76 | +16.1% | Canada Energy Regulator (CER) — Trans Mountain Pipeline Monthly Throughput & Capacity ↗ |
|---|
| Jul 2022 | Jul 31, 2022 | 40.52 | +57.7% | Canada Energy Regulator (CER) — Trans Mountain Pipeline Monthly Throughput & Capacity ↗ |
|---|
| Jun 2022 | Jun 30, 2022 | 37.87 | +5.1% | Canada Energy Regulator (CER) — Trans Mountain Pipeline Monthly Throughput & Capacity ↗ |
|---|
| May 2022 | May 31, 2022 | 38.35 | +13.3% | Canada Energy Regulator (CER) — Trans Mountain Pipeline Monthly Throughput & Capacity ↗ |
|---|
| Apr 2022 | Apr 30, 2022 | 27.97 | -14.4% | Canada Energy Regulator (CER) — Trans Mountain Pipeline Monthly Throughput & Capacity ↗ |
|---|
| Mar 2022 | Mar 31, 2022 | 25.20 | -32.0% | Canada Energy Regulator (CER) — Trans Mountain Pipeline Monthly Throughput & Capacity ↗ |
|---|
| Feb 2022 | Feb 28, 2022 | 32.27 | +2.2% | Canada Energy Regulator (CER) — Trans Mountain Pipeline Monthly Throughput & Capacity ↗ |
|---|
| Jan 2022 | Jan 31, 2022 | 26.38 | -18.3% | Canada Energy Regulator (CER) — Trans Mountain Pipeline Monthly Throughput & Capacity ↗ |
|---|
| Dec 2021 | Dec 31, 2021 | 22.24 | -36.4% | Canada Energy Regulator (CER) — Trans Mountain Pipeline Monthly Throughput & Capacity ↗ |
|---|
| Nov 2021 | Nov 30, 2021 | 12.24 | -63.6% | Canada Energy Regulator (CER) — Trans Mountain Pipeline Monthly Throughput & Capacity ↗ |
|---|
| Oct 2021 | Oct 31, 2021 | 32.21 | -2.9% | Canada Energy Regulator (CER) — Trans Mountain Pipeline Monthly Throughput & Capacity ↗ |
|---|
| Sep 2021 | Sep 30, 2021 | 30.60 | -5.5% | Canada Energy Regulator (CER) — Trans Mountain Pipeline Monthly Throughput & Capacity ↗ |
|---|
| Aug 2021 | Aug 31, 2021 | 33.39 | -14.6% | Canada Energy Regulator (CER) — Trans Mountain Pipeline Monthly Throughput & Capacity ↗ |
|---|
| Jul 2021 | Jul 31, 2021 | 25.69 | -31.3% | Canada Energy Regulator (CER) — Trans Mountain Pipeline Monthly Throughput & Capacity ↗ |
|---|
| Jun 2021 | Jun 30, 2021 | 36.02 | +46.0% | Canada Energy Regulator (CER) — Trans Mountain Pipeline Monthly Throughput & Capacity ↗ |
|---|
| May 2021 | May 31, 2021 | 33.85 | +76.8% | Canada Energy Regulator (CER) — Trans Mountain Pipeline Monthly Throughput & Capacity ↗ |
|---|
| Apr 2021 | Apr 30, 2021 | 32.67 | +13.4% | Canada Energy Regulator (CER) — Trans Mountain Pipeline Monthly Throughput & Capacity ↗ |
|---|
| Mar 2021 | Mar 31, 2021 | 37.08 | +20.0% | Canada Energy Regulator (CER) — Trans Mountain Pipeline Monthly Throughput & Capacity ↗ |
|---|
| Feb 2021 | Feb 28, 2021 | 31.59 | +9.3% | Canada Energy Regulator (CER) — Trans Mountain Pipeline Monthly Throughput & Capacity ↗ |
|---|
| Jan 2021 | Jan 31, 2021 | 32.30 | +3.9% | Canada Energy Regulator (CER) — Trans Mountain Pipeline Monthly Throughput & Capacity ↗ |
|---|
| Dec 2020 | Dec 31, 2020 | 34.99 | +12.3% | Canada Energy Regulator (CER) — Trans Mountain Pipeline Monthly Throughput & Capacity ↗ |
|---|
| Nov 2020 | Nov 30, 2020 | 33.64 | +4.2% | Canada Energy Regulator (CER) — Trans Mountain Pipeline Monthly Throughput & Capacity ↗ |
|---|
| Oct 2020 | Oct 31, 2020 | 33.17 | -4.5% | Canada Energy Regulator (CER) — Trans Mountain Pipeline Monthly Throughput & Capacity ↗ |
|---|
| Sep 2020 | Sep 30, 2020 | 32.39 | -4.1% | Canada Energy Regulator (CER) — Trans Mountain Pipeline Monthly Throughput & Capacity ↗ |
|---|
| Aug 2020 | Aug 31, 2020 | 39.11 | +29.0% | Canada Energy Regulator (CER) — Trans Mountain Pipeline Monthly Throughput & Capacity ↗ |
|---|
| Jul 2020 | Jul 31, 2020 | 37.39 | +8.6% | Canada Energy Regulator (CER) — Trans Mountain Pipeline Monthly Throughput & Capacity ↗ |
|---|
| Jun 2020 | Jun 30, 2020 | 24.67 | -14.6% | Canada Energy Regulator (CER) — Trans Mountain Pipeline Monthly Throughput & Capacity ↗ |
|---|
| May 2020 | May 31, 2020 | 19.15 | -46.6% | Canada Energy Regulator (CER) — Trans Mountain Pipeline Monthly Throughput & Capacity ↗ |
|---|
| Apr 2020 | Apr 30, 2020 | 28.82 | +3.0% | Canada Energy Regulator (CER) — Trans Mountain Pipeline Monthly Throughput & Capacity ↗ |
|---|
| Mar 2020 | Mar 31, 2020 | 30.89 | +6.3% | Canada Energy Regulator (CER) — Trans Mountain Pipeline Monthly Throughput & Capacity ↗ |
|---|
| Feb 2020 | Feb 29, 2020 | 28.89 | -15.4% | Canada Energy Regulator (CER) — Trans Mountain Pipeline Monthly Throughput & Capacity ↗ |
|---|
| Jan 2020 | Jan 31, 2020 | 31.08 | -5.9% | Canada Energy Regulator (CER) — Trans Mountain Pipeline Monthly Throughput & Capacity ↗ |
|---|
| Dec 2019 | Dec 31, 2019 | 31.16 | +29.8% | Canada Energy Regulator (CER) — Trans Mountain Pipeline Monthly Throughput & Capacity ↗ |
|---|
| Nov 2019 | Nov 30, 2019 | 32.28 | +112.8% | Canada Energy Regulator (CER) — Trans Mountain Pipeline Monthly Throughput & Capacity ↗ |
|---|
| Oct 2019 | Oct 31, 2019 | 34.74 | +87.3% | Canada Energy Regulator (CER) — Trans Mountain Pipeline Monthly Throughput & Capacity ↗ |
|---|
| Sep 2019 | Sep 30, 2019 | 33.77 | +40.4% | Canada Energy Regulator (CER) — Trans Mountain Pipeline Monthly Throughput & Capacity ↗ |
|---|
| Aug 2019 | Aug 31, 2019 | 30.32 | +31.1% | Canada Energy Regulator (CER) — Trans Mountain Pipeline Monthly Throughput & Capacity ↗ |
|---|
| Jul 2019 | Jul 31, 2019 | 34.44 | +50.9% | Canada Energy Regulator (CER) — Trans Mountain Pipeline Monthly Throughput & Capacity ↗ |
|---|
| Jun 2019 | Jun 30, 2019 | 28.88 | +2.0% | Canada Energy Regulator (CER) — Trans Mountain Pipeline Monthly Throughput & Capacity ↗ |
|---|
| May 2019 | May 31, 2019 | 35.89 | +41.6% | Canada Energy Regulator (CER) — Trans Mountain Pipeline Monthly Throughput & Capacity ↗ |
|---|
| Apr 2019 | Apr 30, 2019 | 27.98 | +15.8% | Canada Energy Regulator (CER) — Trans Mountain Pipeline Monthly Throughput & Capacity ↗ |
|---|
| Mar 2019 | Mar 31, 2019 | 29.06 | +0.9% | Canada Energy Regulator (CER) — Trans Mountain Pipeline Monthly Throughput & Capacity ↗ |
|---|
| Feb 2019 | Feb 28, 2019 | 34.16 | +45.5% | Canada Energy Regulator (CER) — Trans Mountain Pipeline Monthly Throughput & Capacity ↗ |
|---|
| Jan 2019 | Jan 31, 2019 | 33.03 | +57.8% | Canada Energy Regulator (CER) — Trans Mountain Pipeline Monthly Throughput & Capacity ↗ |
|---|
| Dec 2018 | Dec 31, 2018 | 24.01 | – | Canada Energy Regulator (CER) — Trans Mountain Pipeline Monthly Throughput & Capacity ↗ |
|---|
| Nov 2018 | Nov 30, 2018 | 15.17 | – | Canada Energy Regulator (CER) — Trans Mountain Pipeline Monthly Throughput & Capacity ↗ |
|---|
| Oct 2018 | Oct 31, 2018 | 18.55 | – | Canada Energy Regulator (CER) — Trans Mountain Pipeline Monthly Throughput & Capacity ↗ |
|---|
| Sep 2018 | Sep 30, 2018 | 24.05 | – | Canada Energy Regulator (CER) — Trans Mountain Pipeline Monthly Throughput & Capacity ↗ |
|---|
| Aug 2018 | Aug 31, 2018 | 23.12 | – | Canada Energy Regulator (CER) — Trans Mountain Pipeline Monthly Throughput & Capacity ↗ |
|---|
| Jul 2018 | Jul 31, 2018 | 22.83 | – | Canada Energy Regulator (CER) — Trans Mountain Pipeline Monthly Throughput & Capacity ↗ |
|---|
| Jun 2018 | Jun 30, 2018 | 28.30 | – | Canada Energy Regulator (CER) — Trans Mountain Pipeline Monthly Throughput & Capacity ↗ |
|---|
| May 2018 | May 31, 2018 | 25.35 | – | Canada Energy Regulator (CER) — Trans Mountain Pipeline Monthly Throughput & Capacity ↗ |
|---|
| Apr 2018 | Apr 30, 2018 | 24.17 | – | Canada Energy Regulator (CER) — Trans Mountain Pipeline Monthly Throughput & Capacity ↗ |
|---|
| Mar 2018 | Mar 31, 2018 | 28.80 | – | Canada Energy Regulator (CER) — Trans Mountain Pipeline Monthly Throughput & Capacity ↗ |
|---|
| Feb 2018 | Feb 28, 2018 | 23.48 | – | Canada Energy Regulator (CER) — Trans Mountain Pipeline Monthly Throughput & Capacity ↗ |
|---|
| Jan 2018 | Jan 31, 2018 | 20.93 | – | Canada Energy Regulator (CER) — Trans Mountain Pipeline Monthly Throughput & Capacity ↗ |
|---|