Rio Tinto PLC
RIONYSEMetal MiningFiscal year ends December 31Also trades as RTPPF
$82.73+0.84 (+1.03%)
Close on Nov 2, 2026Market cap $103.91BP/E 13.6Yield –
Rio Tinto Bingham Canyon / Kennecott by Year
Bingham Canyon / Kennecott (Utah USA, 100% basis) — Mill Copper Head Grade (% Cu) (%)
Rio Tinto Bingham Canyon / Kennecott: 0.4% in FY2025, up 0.0 pts from a year earlier.
Latest, FY2025
0.4%
Period ended Dec 31, 2025
Change on a year earlier
+0.0 pts
0.4% in FY2024
History
13 years
Since FY2013
Sources
12
Documents cited below
Where the FY2025 figure comes from
Source: Rio Tinto Investor Relations (2025-fourth-qor-production-tables-xlsx.xlsx) ↗
Annual history
Hover a value to see the sentence it was read from; calculated values show their formula
Breakdown
What makes up bingham Canyon / Kennecott
- Bingham Canyon — Mill Gold Head Grade (g/t Au)0.16 · FY2025
- Bingham Canyon — Mill Molybdenum Head Grade (% Mo)0.0% · FY2025
- Bingham Canyon — Copper Concentrates Produced (kt)543.70 · FY2025
- Bingham Canyon — Average Copper Concentrate Grade (% Cu)22.9% · FY2025
- Bingham Canyon — Copper in Concentrates (kt)125.10 · FY2025
- Kennecott Smelter — Concentrates Smelted (kt)610.80 · FY2025
- Kennecott Smelter — Copper Anodes Produced (kt)135.40 · FY2025
- Kennecott Refinery — Refined Copper Cathode (kt)133.60 · FY2025
Cite this data
StockData. (2026). Rio Tinto Bingham Canyon / Kennecott (%), annual FY2013–FY2025 [Data set]. Compiled from Rio Tinto SEC filings and investor materials. https://stockdatahq.com/stocks/rio/kpis/ops-kenn-grade-cu-pct
See every metric in the Rio Tinto KPI table. Data updated Nov 1, 2026.