StockData
Freeport-McMoRan Inc logo

Freeport-McMoRan Inc

FCXNYSEMetal MiningFiscal year ends December 31
Financials through Q2 FY2026, quarter ended Jun 30, 2026Last filing: 10-Q on Nov 6, 2026Score 6/305% above fair value
$48.55+0.82 (+1.72%)

Close on Nov 25, 2026Market cap $69.72BP/E 23.9Yield 1.24%

Freeport-McMoRan PT Smelting (Gresik, Indonesia) by Year

PT Smelting (Gresik, Indonesia) — Copper Cathode Production (MT)

Freeport-McMoRan PT Smelting (Gresik, Indonesia): 207,200 in FY2025, down 38.2% from a year earlier.

Latest, FY2025
207,200
Period ended Dec 31, 2025
Change on a year earlier
-38.2%
335,200 in FY2024
History
10 years
Since FY2015
Sources
6
Documents cited below

Where the FY2025 figure comes from

“PT Smelting’s copper anode production from its smelter totaled 230,300 metric tons in 2025, 398,200 metric tons in 2024 and 251,300 metric tons in 2023. Copper cathode production from its refinery totaled 207,200 metric tons in 2025, 335,200 metric tons in 2024 and 212,000 metric tons in 2023. Lower production volumes in 2025, compared to 2024 and 2023, reflect the timing of the September 2025 mud”

Source: FCX SEC Filing (FY2025Q4/filing: 0000831259-26-000012 / fcx-20251231.htm) ↗

annual history

Hover a value to see the sentence it was read from; calculated values show their formula

Cite this data

StockData. (2026). Freeport-McMoRan PT Smelting (Gresik, Indonesia), annual FY2015–FY2025 [Data set]. Compiled from Freeport-McMoRan SEC filings and investor materials. https://stockdatahq.com/stocks/fcx/kpis/smelt-pt-smelting-cathode-mt

See every metric in the Freeport-McMoRan KPI table. Data updated Oct 28, 2026.

See a number that looks wrong?