Equinox Gold Corp.
Close on Nov 25, 2026Market cap $7.13BP/E 25.9Yield –
Equinox Gold Greenstone Mine by Quarter
Greenstone Mine — Ontario, Canada (Gold Produced, oz)
Equinox Gold Greenstone Mine: 60,596.00 oz in Q3 2026, up 8.2% from a year earlier.
Where the Q3 2026 figure comes from
“Greenstone | Gold produced | FY2026Q3: 60,596”
Source: Equinox Gold Corp. SEC Filing (0001756607-26-000013 / eqx-20260930mda.htm) ↗
Flagship open-pit mine in Geraldton, Ontario (27,000 tpd mill design). Equinox Gold consolidated 100% ownership in May 2024 (up from 60%), poured first gold in May 2024, and achieved commercial production in November 2024.
quarterly history
Hover a value to see the sentence it was read from; calculated values show their formula
Breakdown
What makes up greenstone Mine
Cite this data
StockData. (2026). Equinox Gold Greenstone Mine, quarterly Q2 2024–Q3 2026 [Data set]. Compiled from Equinox Gold SEC filings and investor materials. https://stockdatahq.com/stocks/eqx/kpis/gs-gold-produced-oz
See every metric in the Equinox Gold KPI table. Data updated Nov 15, 2026.
See a number that looks wrong?