Cenovus Energy Inc.
Close on Nov 2, 2026Market cap $57.78BP/E 19.9Yield –
Cenovus Energy Foster Creek SAGD (AER Scheme 8623, 100% WI) by Month
Foster Creek SAGD (AER Scheme 8623, 100% WI) — Monthly Bitumen Production (Mbbls/d)
Cenovus Energy Foster Creek SAGD (AER Scheme 8623, 100% WI): 249 in Aug 2026, up 18.2% from a year earlier. That is the highest of the 80 months on record here.
Where the Aug 2026 figure comes from
Source: Alberta Energy Regulator (AER) ST53 Alberta In Situ Oil Sands Production Summary (Current) ↗
Monthly scheme telemetry reported by the Alberta Energy Regulator (AER ST53) through August 2026 (two months ahead of Q3 2026 company reporting). Foster Creek produced 217.5 Mbbls/d in July 2026 and 219.9 Mbbls/d in August 2026 at a 2.57x SOR.
Monthly history
Hover a value to see the sentence it was read from; calculated values show their formula
Breakdown
What makes up foster Creek SAGD (AER Scheme 8623, 100% WI)
- Foster Creek SAGD (AER Scheme 8623, 100% WI) — Monthly Bitumen Production (m³/d)39,505 · Aug 2026
- Foster Creek SAGD (AER Scheme 8623, 100% WI) — Monthly Steam Injection (m³/d)81,745 · Aug 2026
- Foster Creek SAGD (AER Scheme 8623, 100% WI) — Monthly Steam-to-Oil Ratio (SOR, x)2.07 · Aug 2026
- Foster Creek SAGD (AER Scheme 8623, 100% WI) — Monthly Produced Water (m³/d)94,500 · Aug 2026
- Foster Creek SAGD (AER Scheme 8623, 100% WI) — Monthly Water-to-Steam Ratio (WSR, x)1.16 · Aug 2026
- Foster Creek SAGD (AER Scheme 8623, 100% WI) — Monthly Active Producing SAGD Wells (Count)595 · Aug 2026
- Foster Creek SAGD (AER Scheme 8623, 100% WI) — Monthly Capable SAGD Wells (Count)1,023 · Aug 2026
Cite this data
StockData. (2026). Cenovus Energy Foster Creek SAGD (AER Scheme 8623, 100% WI), monthly Jan 2020–Aug 2026 [Data set]. Compiled from Cenovus Energy SEC filings and investor materials. https://stockdatahq.com/stocks/cve/kpis/aer-st53-8623-bit-bbl
See every metric in the Cenovus Energy KPI table. Data updated Nov 3, 2026.