Cenovus Energy Inc.
Close on Nov 2, 2026Market cap $57.78BP/E 20.0Yield –
Cenovus Energy Christina Lake Legacy SAGD by Month
Christina Lake Legacy SAGD (AER Scheme 8591, 100% WI) — Monthly Bitumen Production (Mbbls/d)
Cenovus Energy Christina Lake Legacy SAGD: 206 in Aug 2026, down 14.0% from a year earlier.
Where the Aug 2026 figure comes from
Source: Alberta Energy Regulator (AER) ST53 Alberta In Situ Oil Sands Production Summary (Current) ↗
Produced 232.1 Mbbls/d in July 2026 and 235.9 Mbbls/d in August 2026 at a 1.98x SOR.
Monthly history
Hover a value to see the sentence it was read from; calculated values show their formula
Breakdown
What makes up christina Lake Legacy SAGD
- Christina Lake Legacy SAGD (AER Scheme 8591, 100% WI) — Monthly Bitumen Production (m³/d)32,724 · Aug 2026
- Christina Lake Legacy SAGD (AER Scheme 8591, 100% WI) — Monthly Steam Injection (m³/d)55,766 · Aug 2026
- Christina Lake Legacy SAGD (AER Scheme 8591, 100% WI) — Monthly Steam-to-Oil Ratio (SOR, x)1.70 · Aug 2026
- Christina Lake Legacy SAGD (AER Scheme 8591, 100% WI) — Monthly Produced Water (m³/d)68,565 · Aug 2026
- Christina Lake Legacy SAGD (AER Scheme 8591, 100% WI) — Monthly Water-to-Steam Ratio (WSR, x)1.23 · Aug 2026
- Christina Lake Legacy SAGD (AER Scheme 8591, 100% WI) — Monthly Active Producing SAGD Wells (Count)619 · Aug 2026
- Christina Lake Legacy SAGD (AER Scheme 8591, 100% WI) — Monthly Capable SAGD Wells (Count)829 · Aug 2026
Cite this data
StockData. (2026). Cenovus Energy Christina Lake Legacy SAGD, monthly Jan 2020–Aug 2026 [Data set]. Compiled from Cenovus Energy SEC filings and investor materials. https://stockdatahq.com/stocks/cve/kpis/aer-st53-8591-bit-bbl
See every metric in the Cenovus Energy KPI table. Data updated Nov 3, 2026.