First Majestic Silver Corp
Close on Nov 20, 2026Market cap $5.36BP/E 32.1Yield –
First Majestic Silver San Dimas (Durango/Sinaloa, Mexico by Quarter
San Dimas (Durango/Sinaloa, Mexico — 100%) — Silver Head Grade (g/t)
First Majestic Silver San Dimas (Durango/Sinaloa, Mexico: 133.00 g/t in Q3 2026, down 40.1% from a year earlier. That is the lowest of the 34 quarters on record here.
Where the Q3 2026 figure comes from
Source: First Majestic 6-K (6k_2026q3_mda) ↗
Underground silver-gold complex powered partly by captive Las Truchas hydroelectric facility; subject to Wheaton 25% AuEq stream.
quarterly history
Hover a value to see the sentence it was read from; calculated values show their formula
Breakdown
What makes up san Dimas (Durango/Sinaloa, Mexico
- San Dimas (Durango/Sinaloa, Mexico — 100%) — Gold Head Grade (g/t)1.51 · Q3 2026
- San Dimas (Durango/Sinaloa, Mexico — 100%) — Silver Metallurgical Recovery (%)88.0% · Q3 2026
- San Dimas (Durango/Sinaloa, Mexico — 100%) — Gold Metallurgical Recovery (%)93.0% · Q3 2026
- San Dimas (Durango/Sinaloa, Mexico — 100%) — Direct Mining Cost15.0 · Q3 2026
- San Dimas (Durango/Sinaloa, Mexico — 100%) — Direct Milling Cost7.94 · Q3 2026
- San Dimas (Durango/Sinaloa, Mexico — 100%) — Indirect Site Cost13.1 · Q3 2026
- San Dimas (Durango/Sinaloa, Mexico — 100%) — Total Production Cost36.0 · Q3 2026
- San Dimas (Durango/Sinaloa, Mexico — 100%) — Smelting & Refining Charges0.29 · Q3 2026
- San Dimas (Durango/Sinaloa, Mexico — 100%) — Transportation & Selling Costs0.24 · Q3 2026
- San Dimas (Durango/Sinaloa, Mexico — 100%) — Environmental Duties & Royalties0.75 · Q3 2026
- San Dimas (Durango/Sinaloa, Mexico — 100%) — Inventory Cost Changes-1.58 · Q3 2026
- San Dimas (Durango/Sinaloa, Mexico — 100%) — Total Cash Costs35.7 · Q3 2026
- San Dimas (Durango/Sinaloa, Mexico — 100%) — Workers' Participation (PTU)7.62 · Q3 2026
- San Dimas (Durango/Sinaloa, Mexico — 100%) — Sustaining Capital Expenditures6.32 · Q3 2026
- San Dimas (Durango/Sinaloa, Mexico — 100%) — Operating Lease Payments (AISC)1.10 · Q3 2026
- San Dimas (Durango/Sinaloa, Mexico — 100%) — Reclamation Accretion0.36 · Q3 2026
- San Dimas (Durango/Sinaloa, Mexico — 100%) — Total All-In Sustaining Costs51.1 · Q3 2026
Cite this data
StockData. (2026). First Majestic Silver San Dimas (Durango/Sinaloa, Mexico, quarterly Q2 2018–Q3 2026 [Data set]. Compiled from First Majestic Silver SEC filings and investor materials. https://stockdatahq.com/stocks/ag/kpis/sdm-ag-grade
See every metric in the First Majestic Silver KPI table. Data updated Nov 16, 2026.
See a number that looks wrong?