American Electric Power Co Inc
Close on Nov 20, 2026Market cap $68.14BP/E 20.4Yield 2.99%
American Electric Power Total AEP System by Year
Total AEP System — Electric Transmission Line Circuit Miles
American Electric Power Total AEP System: 38,527.00 Miles in FY2025, up 0.6% from a year earlier.
Where the FY2025 figure comes from
“TOTAL 2,124 113 6,034 141 364 17,420 39 2 10,542 875 48 798 27 38,527”
Source: AEP factbook (eei_factbook_2025) ↗
Total AEP system transmission circuit miles across 11 states (~40,000 circuit miles, the largest transmission network in the United States; excludes ~2,300 miles owned by ETT and joint ventures).
annual history
Hover a value to see the sentence it was read from; calculated values show their formula
| Period | Ended | Total AEP System — Electric Transmission Line Circuit Miles | Year on year | Source |
|---|---|---|---|---|
| FY2025 | Dec 31, 2025 | 38,527.00 | +0.6% | AEP factbook (eei_factbook_2025) ↗ |
| FY2024 | Dec 31, 2024 | 38,305.00 | +0.2% | AEP factbook (eei_factbook_2024) ↗ |
| FY2023 | Dec 31, 2023 | 38,221.00 | +3.5% | AEP factbook (eei_factbook_2023) ↗ |
| FY2022 | Dec 31, 2022 | 36,944.00 | -2.8% | AEP factbook (eei_factbook_2022) ↗ |
| FY2021 | Dec 31, 2021 | 37,989.00 | – | AEP factbook (eei_factbook_2021) ↗ |
Breakdown
What makes up total AEP System
- AEP Texas — Transmission Circuit Miles8,611.00 · FY2025
- AEP Ohio — Transmission Circuit Miles7,092.00 · FY2025
- Appalachian Power (APCo) — Transmission Circuit Miles5,791.00 · FY2025
- Indiana Michigan Power (I&M) — Transmission Circuit Miles3,856.00 · FY2025
- Southwestern Electric Power (SWEPCo) — Transmission Circuit Miles4,122.00 · FY2025
- Public Service Co. of Oklahoma (PSO) — Transmission Circuit Miles2,559.00 · FY2025
- Wheeling Power (WPCo) — Transmission Circuit Miles278.00 · FY2025
- Kingsport Power (KGPCo) — Transmission Circuit Miles73.00 · FY2025
- Texas — State Transmission Circuit Miles10,875.00 · FY2025
- Ohio — State Transmission Circuit Miles8,778.00 · FY2025
- Indiana — State Transmission Circuit Miles4,359.00 · FY2025
- Oklahoma — State Transmission Circuit Miles3,863.00 · FY2025
- Virginia — State Transmission Circuit Miles2,974.00 · FY2025
- West Virginia — State Transmission Circuit Miles3,400.00 · FY2025
- Arkansas — State Transmission Circuit Miles1,075.00 · FY2025
- Louisiana — State Transmission Circuit Miles715.00 · FY2025
- Tennessee — State Transmission Circuit Miles275.00 · FY2025
Cite this data
StockData. (2026). American Electric Power Total AEP System, annual FY2021–FY2025 [Data set]. Compiled from American Electric Power SEC filings and investor materials. https://stockdatahq.com/stocks/aep/kpis/eei-tx-miles-total
See every metric in the American Electric Power KPI table. Data updated Nov 3, 2026.
See a number that looks wrong?