Eaton U.S. Data Center Construction Backlog Runway at by Quarter
U.S. Data Center Construction Backlog Runway at Current Build Rates (Years) (years)
Eaton U.S. Data Center Construction Backlog Runway at: 15.0 years in Q2 2026.
Where the Q2 2026 figure comes from
“Total U.S. data center backlog has grown to 307 gigawatts or 15 years of backlog at 2025 build rates, up from 12 years in our last update.”
Source: Eaton IR / Sustainability Report (eaton-etn-q2-2026-earnings-call-transcript) ↗
Reported in Eaton Earnings Call Transcripts (Q4 2025 – Q2 2026: 11 -> 12 -> 15 years at 2025 build rates).
quarterly history
Hover a value to see the sentence it was read from; calculated values show their formula
| Period | Ended | U.S. Data Center Construction Backlog Runway at Current Build Rates (Years) (years) | Year on year | Source |
|---|---|---|---|---|
| Q2 2026 | Jun 30, 2026 | 15.0 | – | Eaton IR / Sustainability Report (eaton-etn-q2-2026-earnings-call-transcript) ↗ |
| Q1 2026 | Mar 31, 2026 | 12.0 | – | Eaton IR / Sustainability Report (eaton-etn-q1-2026-earnings-call-transcript) ↗ |
| Q4 2025 | Dec 31, 2025 | 11.0 | – | Eaton IR / Sustainability Report (eaton-etn-q1-2026-earnings-call-transcript) ↗ |
Cite this data
StockData. (2026). Eaton U.S. Data Center Construction Backlog Runway at (years), quarterly Q4 2025–Q2 2026 [Data set]. Compiled from Eaton SEC filings and investor materials. https://stockdatahq.com/stocks/etn/kpis/dc-us-backlog-years
See every metric in the Eaton KPI table. Data updated Nov 2, 2026.
See a number that looks wrong?