Gulf Run Pipeline (Haynesville to Gulf Coast) — Mainline Design Capacity
Energy Transfer LP Gulf Run Pipeline (Haynesville to Gulf Coast): 3.00 Bcf/d in FY2025, unchanged from a year earlier.
Where the FY2025 figure comes from
“|| Gulf Run Pipeline | 100 | % | 335 | 3.0 | —”
annual history
Hover a value to see the sentence it was read from; calculated values show their formula
| Period | Ended | Gulf Run Pipeline (Haynesville to Gulf Coast) — Mainline Design Capacity | Year on year | Source |
|---|---|---|---|---|
| FY2025 | Dec 31, 2025 | 3.00 | 0.0% | ET FY2025 Form 10-K (0001276187-26-000013) ↗ |
| FY2024 | Dec 31, 2024 | 3.00 | 0.0% | ET FY2024 Form 10-K (0001276187-25-000018) ↗ |
| FY2023 | Dec 31, 2023 | 3.00 | – | ET FY2023 Form 10-K (0001276187-24-000024) ↗ |
Breakdown
What makes up gulf Run Pipeline (Haynesville to Gulf Coast)
Cite this data
StockData. (2026). Energy Transfer LP Gulf Run Pipeline (Haynesville to Gulf Coast), annual FY2023–FY2025 [Data set]. Compiled from Energy Transfer LP SEC filings and investor materials. https://stockdatahq.com/stocks/et/kpis/inter-cap-gulf-run-pipeline
See every metric in the Energy Transfer LP KPI table. Data updated Nov 4, 2026.
See a number that looks wrong?