Equinox Gold Corp.
Close on Nov 25, 2026Market cap $7.13BP/E 25.9Yield 0.58%
Equinox Gold Total Water Withdrawn (Megaliters, ML) by Year
Equinox Gold Total Water Withdrawn (Megaliters, ML): 19,914 in FY2025, up 45.0% from a year earlier.
Where the FY2025 figure comes from
“2025 Sustainability Databook | Total Water Withdrawn (m3) | FY2025: 19913764.0”
Source: Equinox Gold 2025 Sustainability Databook (GRI & SASB Workbook) ↗
Annual water stewardship, mineral waste (tailings & waste rock), land disturbance, and environmental incident metrics (FY2022–FY2025).
annual history
Hover a value to see the sentence it was read from; calculated values show their formula
| Period | Ended | Total Water Withdrawn (Megaliters, ML) | Year on year | Source |
|---|---|---|---|---|
| FY2025 | Dec 31, 2025 | 19,914 | +45.0% | Equinox Gold 2025 Sustainability Databook (GRI & SASB Workbook) ↗ |
| FY2024 | Dec 31, 2024 | 13,734 | -9.5% | Equinox Gold 2025 Sustainability Databook (GRI & SASB Workbook) ↗ |
| FY2023 | Dec 31, 2023 | 15,169 | +49.4% | Equinox Gold 2025 Sustainability Databook (GRI & SASB Workbook) ↗ |
| FY2022 | Dec 31, 2022 | 10,153 | – | Equinox Gold 2025 Sustainability Databook (GRI & SASB Workbook) ↗ |
Breakdown
What makes up total Water Withdrawn (Megaliters, ML)
- Total Water Discharged (Megaliters, ML)11,966 · FY2025
- Sustainability Scope Total Ore Processed (kt)27,578.00 · FY2025
- Total Waste Rock Mined (kt)185,432.00 · FY2025
- Total Tailings Produced (kt)17,903.00 · FY2025
- Non-Hazardous Site Waste Generated (Tonnes)32,389 · FY2025
- Hazardous Site Waste Generated (Tonnes)4,481 · FY2025
- Cumulative / Annual Land Newly Disturbed (Hectares)448 · FY2025
- Land Rehabilitated / Reclaimed (Hectares)40 · FY2025
- Significant Environmental Incident Frequency Rate — SEIFR (per Million Hours)0.00 · FY2025
Cite this data
StockData. (2026). Equinox Gold Total Water Withdrawn (Megaliters, ML), annual FY2022–FY2025 [Data set]. Compiled from Equinox Gold SEC filings and investor materials. https://stockdatahq.com/stocks/eqx/kpis/esg-water-withdrawn-ml
See every metric in the Equinox Gold KPI table. Data updated Nov 15, 2026.
See a number that looks wrong?